- 247,676 sq. ft. train manufacturing facility for Siemens Mobility in Goole.
- The facility is split across a number of buildings including; manufacturing and commissioning buildings, warehouses, offices, and stabling sidings.
- The project also includes the construction of four and a half kilometres of rail track needed for connection to the main railway line.
- New Piccadilly line tube and future main line trains are to be built on the site.
- Client – Siemens Mobility
- Duration – 74 weeks
- Size – 247,676 sq ft