Vantec III, Sunderland

  • New distribution facility for Vantec Europe delivered on time and within budget
  • Second project undertaken by GMI following the successful completion of Vantec I at Turbine Business Park
  • 436,000 sq ft piled steel frame
  • Consisting of 5 portal frames, full clad with both level and dock level access doors
  • Fibre concrete suspended floor over 5,000 pre-cast concrete piles
  • Site required ground stabilisation works prior to work being carried out

Project Details

  • Client – Vantec Europe
  • Duration – 33¬†Weeks
  • Size – 436,000 sq ft