Hat Box, Milliners Wharf, Manchester

  • 144 high specification apartments
  • Mix of 1 bed garden apartments, 2 bed corner duplexes & 3 bed corner apartments
  • Planned to maximise light and space with full height glazing
  • Most apartments have balcony or private terrace
  • Contemporary fixtures and fittings
  • Constructed alongside live tram line and adjacent to existing occupied apartments, making logistics and planning paramount

Project Details

  • Client – Fairbriar Hatbox Ltd
  • Duration – 78¬†weeks
  • Size – 144 apartments
© Copyright 2016 GMI Construction | Staff Portal
Web Design, Hosting & SEO by Buffalo

Fatal error: Uncaught exception 'wfWAFStorageFileException' with message 'Unable to save temporary file for atomic writing.' in /home/gmiconst/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:30 Stack trace: #0 /home/gmiconst/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(650): wfWAFStorageFile::atomicFilePutContents('/home/gmiconst/...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('livewaf') #2 {main} thrown in /home/gmiconst/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 30