Civic Offices, Rotherham

  • State of the art civic offices in Rotherham
  • Following construction and Cat A fit out GMI negotiated the Cat B fit out directly with Rotherham MBC
  • Introduction of ‘Workstyle’ strategy allowed the introduction of new flexible, mobile working
  • BREEAM ‘Excellent’

Project Details

  • Client – Rotherham MBC
  • Duration – 62 Weeks
  • Size – 200,000 sq ft
© Copyright 2016 GMI Construction | Staff Portal
Web Design, Hosting & SEO by Buffalo

Fatal error: Uncaught exception 'wfWAFStorageFileException' with message 'Unable to save temporary file for atomic writing.' in /home/gmiconst/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php:30 Stack trace: #0 /home/gmiconst/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php(650): wfWAFStorageFile::atomicFilePutContents('/home/gmiconst/...', '<?php exit('Acc...') #1 [internal function]: wfWAFStorageFile->saveConfig('livewaf') #2 {main} thrown in /home/gmiconst/public_html/wp-content/plugins/wordfence/vendor/wordfence/wf-waf/src/lib/storage/file.php on line 30